Mohawk Nation of Grand RiverMohawk UniversityStart learning

Courses · MAP 102 Reading the land record: surveys, parcels and map data · Lesson 1 of 4

Reading a plan of survey

Lecture 1 of 4 · about 7 minutes

Before you begin, ask yourself. The lecture answers these questions, and you will meet them again at the end.

  1. What is N 45° 30′ E?
  2. Which generally prevails, a found original monument or a written measurement?
  3. How long is a surveyor’s chain?

MAP 101 taught the measure in the Proclamation: six miles from each side of the river. MAP 201 taught how the Tract’s outline is built up. This course comes down to the single parcel, the lot a house stands on, and teaches how to read the records that describe it. The first is the plan of survey.

A plan is a drawing, made by a licensed surveyor, of the boundaries of a piece of land as measured on the ground. Every plan has the same parts, and once you know them any plan can be read.

Find the title block first. It says what the plan is, what land it covers, who made it and when. In Ontario the land is described by its place in the old survey grid: a lot, in a concession, in a geographic township. Those lots were laid out when the land was first surveyed for settlement, and every later description hangs on them. Plans deposited in the land registry carry a number: a reference plan describes parts of an existing parcel, and a plan of subdivision creates new lots.

Find north, and the scale. The north arrow shows which way the plan faces, and a note says what north means on this plan, since surveyors may refer bearings to a grid or to an older plan. The scale tells you how much ground a centimetre covers.

Now the boundaries. Each line has a bearing and a distance. A bearing is a direction, given as an angle east or west of north or south: N 45° 30′ E means forty-five and a half degrees east of north. A distance is given in metres on modern plans. Older plans use feet, or chains and links: a surveyor’s chain is sixty-six feet, and a hundred links make a chain. Follow the lines round in order, from the point where the description begins, and you return to where you started.

The table lists the parts of a plan of survey in the order to read them. Read across: the part, and what it tells you.
ReadIt tells youThe title blockWhat land, who surveyed it, whenNorth and the scaleWhich way it faces; how much ground acentimetre coversBearings and distancesThe direction and length of each boundaryMonumentsThe marks in the ground, found or plantedNotes and legendWhat the symbols mean; what was relied onNeighbours and waterWhat lies beyond; where the bank was that day

Pause. Look away from the page and say in your own words what “Plan of survey” means. Then read on.

At each corner is a monument, a physical mark set in the ground: an iron bar, a concrete pin, a cut cross. The plan shows by symbols and letters which were found and which were newly planted. This matters more than beginners expect. In the law of boundaries, a monument found on the ground in its original place generally prevails over a measurement written on paper. The land is where the marks are.

Read the notes and the legend. They explain the symbols, say what earlier plans were relied on, and record anything the surveyor could not resolve.

Then look for what the plan shows beyond the boundary: neighbouring lots, a road allowance, a river’s edge. A boundary that follows water is special. It moves, slowly, as the bank moves, and a plan records where the edge was on the day of survey.

That last point reaches back to the Proclamation printed below. A measure taken “from each side of the river” depends on where the river is, and on whether one follows its bends. Reading a plan of a single lot is the same skill as reading the measure of the Tract, at a smaller size.

The source

Whereas His Majesty having been pleased to direct that in consideration of the early attachment to his cause manifested by the Mohawk Indians, and of the loss of their settlement which they thereby sustained, that a convenient tract of land under his protection should be chosen as a safe and comfortable retreat for them and others of the Six Nations […] I do hereby in His Majesty’s name authorize and permit the said Mohawk Nation, and such others of the Six Nation Indians as wish to settle in that quarter, to take possession of and settle upon the banks of the river commonly called Ouse or Grand River, running into Lake Erie, allotting to them for that purpose six miles deep from each side of the river beginning at Lake Erie and extending in that proportion to the head of the said river, which them and their posterity are to enjoy for ever.
The Haldimand Proclamation, 25 October 1784: the measure · Given at Quebec; signed Fred. Haldimand.

Key terms

Plan of survey
A surveyor’s drawing of the boundaries of land as measured on the ground.
Bearing
The direction of a line, as an angle from north or south.
Monument
A physical mark set in the ground at a corner.
Chain
An old surveyor’s measure: sixty-six feet, or a hundred links.

Check yourself

1.What is N 45° 30′ E?
2.Which generally prevails, a found original monument or a written measurement?
3.How long is a surveyor’s chain?

Send to your teacher

Opens your own email with your answers written in. Nothing is sent to or kept by the University.

Summary

Go back to the questions at the top. You should now be able to answer each in a sentence, and to explain these terms: Plan of survey, Bearing, Monument, Chain.